About Us

History

1

Established in 2044.

UCIL was established established on 31 Jestha,2044 (14th June,1987) UCIL is located in Udayapur District of eastern region, which is nearly 200Km for Jogbani Border India. .

2

Project Implementation on Full turn Key basis.

Consulting Engineer: Onoda Engineering Co.Ltd.Japan.

Turnkey Contractor: Consortium of Kawasaki Heavy Industries Ltd and Tomen Corporation –Japan.

3

Annual Requirements.

Raw Materials:

Lime Stone:3,30,000 MT.
IronOre :4,000 MT.
Clay :57,000~82,500 MT.
Gypsum :10,500 MT.
Silica Sand : up to 21,000MT.

"We sell our product under the brand name of "Gaida Cement", one of the best in Nepal, and known for its quality and strength."

Back to Top

Our Cement Features

  • High Compressive Strength
  • Proper balance in Physical and Chemical properties
  • Less time required for setting
  • Setting Time and Fineness is in optimum range which prevents Offset Construction Defect
  • High Soundness Level prevents unnecessary expansion in concrete structure, and hence prevents cracks
  • Low amount of Loss on Ignition (LOI) and Alkali
  • Consistency in Quality
  • Less Construction Cost